How We Build Your Pool

Design & Process · Chicago's North Shore & Northwest Suburbs

The pool construction process starts with the property, not the excavation.

How long does construction take after approvals?

After approvals and site readiness, fiberglass construction typically takes three to four weeks and concrete construction six to eight weeks. Design development, permitting, site conditions, project scope, selections, and season can move that schedule; these are planning ranges, not guarantees.

In-ground pool with a paver deck and black metal fence in a Chicago-area backyard

Chicago's North Shore & Northwest Suburbs

Wave's pool construction process is design-led: assess the property, develop the pool and outdoor setting, coordinate required professionals and village approvals, then build from the approved plan. Gunite/concrete is the flagship custom path; fiberglass is evaluated when space, access, and an available shell form support the property.

01 · Assess and design

Plan the site assessment and design brief

At Wave Outdoors Pools, the process begins with an extensive property and site assessment. Pool form, access, existing grades, the surrounding outdoor room, and desired features are considered before the plan is advanced. Compare the active pool paths and the project cost drivers before the design advances.

Custom 3D design is available as a paid add-on. Engineers and architects are involved when project conditions require them. Explore the pool design process.

Design rendering of a pool, paver deck, outdoor kitchen and pergola planned as one outdoor room
A design rendering, not a photograph: the pool and surrounding outdoor setting studied as one plan before construction.

02 · Engineer and permit

Translate the design into an approvable site plan.

Wave handles village permits and engineering coordination for pool projects. The governing municipality, site conditions, and approved plans determine what is required and how long review takes.

See the dedicated guide to permits and engineering.

Aerial view of a completed rectangular pool, paver deck and fenced yard on a suburban property
Professional and municipal coordination follows the selected design and site conditions.

03 · Build in sequence

Excavation begins after the plan, access, and scope are coordinated.

Construction follows the selected pool system after design, approvals and site readiness. A shotcrete pool creates a reinforced concrete vessel on site, with a separate interior finish. A fiberglass pool brings a manufactured shell to the property; Latham’s installation sequence sets the shell level, adds water and backfill in coordination, and pressure-tests plumbing lines as the work reaches the fittings. These are different construction paths, which is why the plan and schedule must identify the selected system. Equipment, utilities, safety components, deck work, lighting, water features, and the wider poolscape are coordinated around the approved scope. Shell completion and completion of the surrounding backyard are separate milestones.

Gunite / concrete

The flagship custom path when the design calls for a formed-on-site pool and integrated features.

Fiberglass

A second active path when property access, available space, and an available shell form fit the plan.

Systems and safety

Heaters, automation, lighting, covers, alarms, and safety fencing can be integrated where they belong in the selected scope.

Poolscape

Decks, kitchens, structures, grading, drainage, and landscape transitions can complete the outdoor setting.

04 · Finish and hand off

Close the project against the selected scope.

The final stage brings the pool, systems, safety elements, and surrounding work back to the approved project scope. Ask which walkthrough, inspection, startup, and documentation steps apply to the selected system and municipality.

Warranty coverage is available. Confirm the written terms for the selected pool system and components.

Completed freeform pool with a built-in bench and paver surround in a Chicago-area backyard
A completed pool reads as part of the property, not as an isolated object.

Process questions

What homeowners ask before the build starts

The best start window depends on design readiness, permit timing, project scope, and season. Confirm the current plan after those variables are known.

The property is assessed, the pool and surrounding setting are designed, required professional coordination is identified, and village approvals are handled before the approved construction sequence begins.

Gunite/concrete is Wave's flagship custom path. Fiberglass is considered when the property's space and access, and an available shell form, support that direction. Review both within the full project design.

Begin with the property and the plan.

Tell us about the yard, how you want to use the water, and the outdoor spaces that should be designed with it.